Service | Fee | Notes |
---|---|---|
Water and Sewer
Lien Certificate |
$150.00 Maximum | Note 1 |
Return Payment
Processing Fee |
$15.00 | |
Cross Connection
Inspection Fee Administrative Processing Fee |
$110.00 $65.00 |
Note 2 Note 2a |
Installation
Application Fee |
Size of Pipe
3/4" Cost Basis 1" Cost Basis 1 1/2" Cost Basis |
|
Excavation |
Cost Basis $900 deposit required |
|
Fire Pipe Excavation |
Cost Basis $2,500 deposit required |
|
Water/Sewer
Pipe Inspection |
$259.00 per connect or disconnect
(Monday - Saturday, regular hours) $306.00 per connect or disconnect (Monday - Saturday, overtime rate) $353.00 per connect or disconnect (Sundays/Holidays) |
Note 3 |
Water & Sewer Construction
Multi-day Inspection |
$752.00 per diem
(Monday - Saturday, regular hours) $890.00 per diem (Monday - Saturday, overtime rate) $1,027.00 per diem (Sundays/Holidays) |
Note 4 |
Water Turn-off | $40.00 | Note 5 |
Water Turn-on | $40.00 | Note 6 |
Termination Notice Fee | $80.00 | Note 7 |
Fire Flow Test | $442.00 | |
Temporary Connection
(Hydrant Permit) |
$50.00 per 90-day period or fraction thereof,
plus water usage $750.00 deposit required |
Note 8 |
Street Sweeper
Hydrant Permit |
$1575.00 annually | |
Special Meter Test | Cost Basis | Note 9 |
Drain Layer's License |
New - $50.00 Renewal - $15.00 |
|
Construction | Plans & Drawings $6.00 | Note 10 |
Frozen Meter Replacement | Cost Basis | Note 11 |
Water Meter 3 Inches
and Larger Installed |
Cost Basis | |
Sewer Abatement
Meter Installed |
Cost Basis | |
Meter Transmission
Unit Installed (MTU) |
Cost Basis | |
Leak Up To Owner (LUTO)
and Lead Pipe Replacement |
Cost Basis | Note 12 |
General Service Application (GSA) |
$500.00 - $5,000.00 annually (deposit required) |
Note 13 |
Grease Trap Permit Fee | $200 annually | |
Hydrants | Cost Basis | Note 14 |
Industrial Stormwater Inspection Fee | Cost Basis | Note 15 |
As-Built Plans | $200.00 Per site | Note 16 |